our yard is crawling with run-of-the-trees grey bushy-tailed tree-rats, but this guy has brought diversity;-)
Welcome, New Neighbors at 414 Cardinal Glen Cir
Please log in to meet our newest neighbors
storm water management plan for the Parcel F swale announced

After 2½ years of working with the county on this, they have at last come back with a proposed design plan for retrofitting the existing swale. Here are the details:
- The county will retrofit and subsequently assume responsibility for the existing swale from top to bottom (i.e., the entire length, hurray!). We will consequently need to grant them a maximum 20-ft wide easement to do so (more about granting them this easement below). continue reading >>
Rt 7 Shared Use Path Project
The county has informed us that they will begin surveying early next year for a 10′ asphalt path alongside westbound Rt 7 from Lakeland Drive to Campus Drive.
Let’s hope they will fix the drainage pipe undermining the berm between rt 7 and our common ground parcel K.


