the path paralleling rt7 from the eastern edge of cardinal glen to southern oaks terr in westerley is an essential corridor for access to the east. however, as seen looking east from cardinal glen, it’s obvious that people are cutting thru the gap between the westerley fence and 46720 HOLLOW MOUNTAIN PL, a tresspass on the Saggu family, as shown by the dotted red line on the map above. continue reading >>
Category Archives: project
parcel B rehab follow-up work
the county will be fixing the issues on parcel B as soon as the area dries out:

“There is still a low area to address along the upper reach of the channel, as shown in red on the attachment, which was also observed during a follow-up review of the completed work. To access the previously mentioned low area for future repair work, the County would like to go between the 2 and 3 Redwing Ct. residences to bring in additional matting and soil materials by foot and wheelbarrow, respectively, which would eliminate the need for having to drive heavier equipment along the length of the channel from the original Cardinal Glen Cir. entrance.
“When the Public Works crew determines that site conditions are good for repairing the low area within the channel, the residents will be notified.”
parcel B rehab underway
loudoun county stormwater management was finally able to began work on the parcel B swale after their initial survey on january… 
parcel B project underway?

Loudoun county senior stormwater engineer david.wayland@loudoun.gov and crew surveyed the site this morning…

next step is the job description…more on the problem here.
continue reading >>
news from our supervisor
our county supervisor Juli Briskman sends this update on the county’s Capital Improvement Projects: continue reading >>


