Category Archives: hoa

storm water management plan for the Parcel F swale announced

parcel F swale
After 2½ years of working with the county on this, they have at last come back with a proposed design plan for retrofitting the existing swale. Here are the details:

  • The county will retrofit and subsequently assume responsibility for the existing swale from top to bottom (i.e., the entire length, hurray!). We will consequently need to grant them a maximum 20-ft wide easement to do so (more about granting them this easement below). continue reading >>

HOA President Resigns

Bob Bassett has tendered his resignation, effective immediately. Having led the Board for the past 5 years and sheparded us through the arduous merger, he also served on the board of sections 3&4 for 15 years before that.

The remaining members of the board wish to thank him for his long service to our community.