Fallen Tree on Parcel G Cleared
parcel B swale recovering nicely-)
parcel B rehab follow-up work
the county will be fixing the issues on parcel B as soon as the area dries out:
“There is still a low area to address along the upper reach of the channel, as shown in red on the attachment, which was also observed during a follow-up review of the completed work. To access the previously mentioned low area for future repair work, the County would like to go between the 2 and 3 Redwing Ct. residences to bring in additional matting and soil materials by foot and wheelbarrow, respectively, which would eliminate the need for having to drive heavier equipment along the length of the channel from the original Cardinal Glen Cir. entrance.
“When the Public Works crew determines that site conditions are good for repairing the low area within the channel, the residents will be notified.”
parcel B rehab underway
loudoun county stormwater management was finally able to began work on the parcel B swale after their initial survey on january…